NMSU 5-Million Gallon Tank

NMSU 5-Million Gallon Tank ClientNMSU Completion2006 Size5-Million Gallon Cost$2,245,400 This project included a functional design evaluation of the most cost-effective storage tank size for NMSU. Ultimately, a 5-million-gallon storage tank was selected. Given the size of the tank, the mixing system enables the University to provide disinfected water through the storage tank in a mixed and fresh state without any … Read More

Belen Eagle Tank

Belen Eagle Tank ClientCity of Belen Completion2015 Size750,000 Gallon Cost$738,150 The City’s 1-million gallon welded-steel water tank was old and in poor condition. Molzen Corbin prepared a Water Master Plan which, among other improvements, recommended replacing the existing tank with a smaller tank more suited to the expected storage needs of the City. Due to site constraints, the old tank … Read More

Zuni Pueblo Water Improvements Project

Zuni Pueblo Water Improvements Project ClientZuni Pueblo Completion2002 Size2 Wells (1,430 GPM Each) Two 1-million Gallon Tanks 14 miles of Transmission Line 8 miles of Distribution Lines Cost$14,000,000 For more than 20 years, the Pueblo of Zuni depended on bottled water for all of their drinking water needs. The Pueblo hired Molzen Corbin to help the Pueblo solve their water … Read More

Sandia Pueblo Arsenic Treatment Facility

Sandia Pueblo Arsenic Treatment Facility ClientSandia Pueblo Completion2010 Size2,600 GPM Cost$1,596,725 The Pueblo requested our expertise in evaluating a microfiltration based arsenic treatment system that had been recommended by another consulting firm and compare that treatment technology to an oxidation-assisted coagulation/filtration system. Molzen Corbin concluded that the latter system had a lower capital and O&M cost, and the Pueblo agreed … Read More

Bowman Avenue

Bowman Avenue ClientTown of Mesilla Completion2019 Size0.5 Miles Cost$206,659 Bowman Avenue serves as a collector street in the Town of Mesilla through a mix of land uses: farming and residential. Molzen Corbin completed the survey and roadway design, including complete roadway replacement. The existing condition of the road was poor with drainage issues throughout. During coordination, the City of Las … Read More

Harrelson Street

Harrelson Street ClientLas Cruces Completion2018 Size0.25 Miles Cost$824,739 Harrelson Street runs through a mix of manufacturing, residential, and historic areas in the City of Las Cruces. This complete urban road replacement project consisted of roadway design, utility replacement, storm drain throughout the length of the project, and surveying. The project terminated at Union Avenue (NM373), which is a New Mexico … Read More

Valley Drive

Valley Drive ClientNMDOT Completion2020 Size1.5 Miles Cost$25,598,110 The Molzen Corbin project team successfully addressed project challenges and transformed Valley Drive into a modern urban corridor in the heart of the City of Las Cruces that will make traveling safer and more efficient for decades to come. These improvements included enhanced driving lanes, turning lanes, buffered bicycle lanes, buffered sidewalks, raised … Read More

Double Eagle II Aerospace Technology Park Infrastructure Improvements

Double Eagle II Aerospace Technology Park Infrastructure Improvements ClientDouble Eagle II, City of Albuquerque Completion2008 Size200 Acres Cost$3,000,000 Molzen Corbin designed and provided construction administration services for the extension of utilities (storm drainage, water, sanitary sewer, electricity and fiber optic communication) to the 200 acre Aerospace Technology Park (ATP). The project was designed on a fast track schedule to allow … Read More

Double Eagle II Midfield Development, Phases I & II

Double Eagle II Midfield Development, Phases I & II ClientDouble Eagle II, City of Albuquerque Completion2006 Size50 Acres Cost$3,244,744 Continued growth at DE II Airport created a demand for additional aircraft storage. This project included utility, landside, and airside extension and access improvements for approximately 50 acres of additional lease area adjacent to the existing hangar and fixed base operator … Read More

Spaceport Water & Sewer Systems

Spaceport Water & Sewer Systems ClientSpaceport Completion2011 Size4 Wells 1.3-Gallon Water Tank 63,000 LF Water Supply Line 14,950 LF Water Transmission Line 17,300 LF Wastewater Collection Line 20,000-Gallon Effluent Tank Cost$9,700,000 The location of Spaceport America in a region with limited water resources made it necessary to use and re-use available water as efficiently as possible.  Water: Developing a sustainable … Read More