Carlsbad Double Eagle Water System Improvements: Tank and Chlorination Facility (Phase III)

Carlsbad Double Eagle Water System Improvements: Tank and Chlorination Facility (Phase III) ClientCity of Carlsbad Completion2020 (Phase III) Size31,440 LF Water/Transmission Line 5-Million Gallon Tank Cost$11,621,305 (Phase III) Building on the success of Phases I and II of the City of Carlsbad’s Double Eagle Water System Improvements Project, the goal of Phase III was to extend the water supply from … Read More

AWSD Waterline and Rio Grande Directional Drill Crossing

AWSD Waterline and Rio Grande Directional Drill Crossing ClientAWSD Completion2019 Size2.5 Miles of Water Lines 895 LF Horizontal Directional Drill” Cost$892,689 AWSD sought Molzen Corbin’s assistance with providing potable water for an area of Dona Ana County that was being served by both an aging, inadequate water system and wells that had gone dry. Many residents had resorted to hauling … Read More

Carlsbad Double Eagle Water System Improvements (Phases I and II)

Carlsbad Double Eagle Water System Improvements (Phases I and II) ClientCity of Carlsbad Completion2015 Size40 miles of 16-inch and 24-inch Waterline (8 pressure-reducing/pressure sustaining valve stations) Cost$9,378,498 (Phase I) $13,530,393 (Phase II) The City of Carlsbad wanted to transition its primary water supply to the Double Eagle Wellfield located more than 40 miles away. When the City awarded Molzen Corbin … Read More

Las Cruces West Mesa Water System Improvements

Las Cruces West Mesa Water System Improvements ClientCity of Las Cruces Completion2010 (Phase IV-B) Size2 Wells (3,500 GPM each) 46,500 LF water and transmission line 4.5-Million Gallon Reservoir Cost$931,021 (Phase IV-B) This was a four-phase project that included various water supply, transmission, and storage improvements. Highlights included a high-capacity booster station consisting of three 1,000 GPM booster pumps, as well … Read More

Tijeras Well No. 3

Tijeras Well No. 3 ClientVillage of Tijeras CompletionUnder Construction Size90 GPM CostUnder Construction The Village of Tijeras supplies water to its residents with two groundwater wells. In the past few years, Well No 1 has been losing capacity and is not expected to remain a viable source of supply for much longer. The Molzen Corbin Team designed and oversaw drilling … Read More

Carlsbad Sheep Draw Well 6

Carlsbad Sheep Draw Well 6 ClientCity of Carlsbad Completion2016 Size2,400 GPM Cost$1,149,414 Molzen Corbin completed the Phase I Design of the Sheep Draw Well 6 Project in Carlsbad, New Mexico. Construction of this $1.2 million project was completed in March 2016. This 810-foot deep well with 34-inch diameter conductor casing and 18-5/8-inch production casing was drilled in the hard rock … Read More

EAWSD Well 2A/2B Dual Production

EAWSD Well 2A/2B Dual Production ClientEAWSD Completion2018 SizeN/A Cost$220,000 EAWSD drilled Well 2B to replace Well 2A, which had lost production and had sanding problems. However, on further investigation, 2A was found to be suitable to continue producing at a lower rate. The District retained Molzen Corbin to design modifications to the existing well house and piping to accommodate production … Read More

AWSD Well No. 1 and No. 4

Anthony Well No. 1 and No. 4 ClientAWSD Completion2013 Size600 GPM Cost$624,892 Wells No. 1 and No. 4 were re-drilled as part of the District’s Arsenic and Nitrate removal project, and are configured to enable treatment by reverse osmosis at a centralized site. Wells No. 1 and No. 4 are both equipped with 600-gpm pumps, with Well No. 1 designed … Read More

Las Vegas Taylor Well No. 4

Las Vegas Taylor Well No. 4 ClientCity of Las Vegas Completion2013 Size310 GPM Cost$624,892 Although the City of Las Vegas primarily uses surface water for its water supply, ground water from the Taylor Well Field is an important component in its overall water supply program. Since 1964, Molzen Corbin engineers have worked with the City to plan, develop, and improve … Read More

Moriarty Water Tank Rehabilitation

Moriarty Water Tank Rehabilitation ClientCity of Moriarty Completion2014 Size250,000 Gallons and 500,000 Gallons Cost$265,800 The City of Moriarty hired an underwater diver to inspect the condition of its two water-storage tanks (250,000 gallons and 500,000 gallons). Rehabilitation was deemed necessary, so the City selected Molzen Corbin to design plans and specifications. Molzen Corbin helped Moriarty to obtain low-cost financing from … Read More