National Championship Air Races Infrastructure Program

National Championship Air Races Infrastructure Program ClientRoswell International Air Center Completion2025 Cost$15 million The Roswell International Air Center National Championship Air Races Infrastructure Program was a highly collaborative effort among the City of Roswell, Chavez County, the State of New Mexico, the Reno Air Racing Association and Molzen Corbin to plan, design, construct, and activate a complex event site in … Read More

NMSU Football Operations Center

NMSU Football Operations Center ClientNMSU Completion2025 Size18,000 square foot Cost$13.97 Million The New Mexico State University Football Operations Center is an 18,000-square-foot, high-performance addition to the Aggie Memorial Stadium complex that integrates athletics, academics, and sustainability within a constrained infill site. Designed with a split-level configuration to provide both field and concourse access, the facility required innovative structural solutions, including … Read More

Santa Fe Airport Terminal Expansion

Santa Fe Airport Terminal Expansion ClientSanta Fe Municipal Airport Completion2024 Size24,502 Square Feet Cost$23.1 Million The Santa Fe Regional Airport Terminal Building, a vital gateway to northern New Mexico for a wide range of travelers, had become too small to handle rising passenger volumes, leading to overcrowding, long TSA lines, and diminished travel experiences. To address these issues, the City … Read More

Anthony Wastewater Treatment Plant Expansion

Anthony Wastewater Treatment Plant Expansion ClientAWSD Completion2024 Size1.3 MGD Cost$27.1 Million The Anthony Water and Sanitation District (AWSD) Wastewater Treatment Facility underwent a major upgrade, replacing a failing plant with a modern, efficient system after years of Clean Water Act violations. Designed by Molzen Corbin, the new parallel treatment facility—featuring a 1.3 MGD capacity—allows seamless flow transfers and rehabilitation of … Read More

Southside Water Reclamation Plant – Feeder Isolation Switchgear (FIS) Replacement

Southside Water Reclamation Plant – Feeder Isolation Switchgear (FIS) Replacement ClientAlbuquerque Bernalillo County Water Utility Authority Completion2012 Size15kV electrical service switchgear Cost$1.4M Molzen Corbin designed a 12,470V arc-resistant, state-of-the-art switchgear to replace the original gear, which was installed in the early 1960s and was used for interconnection and paralleling with the Public Service Company of New Mexico. The switchgear included … Read More

Water Reclamation Facility Portable Generator Connection Project

Water Reclamation Facility Portable Generator Connection Project ClientAlbuquerque Bernalillo County Water Utility Authority Completion2019 Size3MVA Transformer/ 4,000A Switchboard Cost$954,177 To increase system reliability during extended utility power outages, ABCWUA tasked Molzen Corbin to design portable generator connections at two of the Water Reclamation Facility’s blower buildings. One blower building is served by two 2000A, 480V MCCs connected with a bus … Read More

Corrales Well 9 Electric Motor Conversion

Corrales Well 9 Electric Motor Conversion ClientAlbuquerque Bernalillo County Water Utility Authority Completion2018 Size600 HP Motor Cost$752,051 The Corrales Well Field was designed with natural gas engine-driven well pumps and a small electrical feed from the local utility for ancillary loads. The project included the removal of the gas engine equipment, modification of the HVAC system, upgrade of electrical service, … Read More

Jacob Hands WWTF Primary Feed Replacement Project

Jacob Hands WWTF Primary Feed Replacement Project ClientCity of Las Cruces Completion2020 Size25kV Feed Cost$539,537 Two El Paso Electric feeders serve the Las Cruces Jacob WWTF. The service entered the WWTF underground at 25 kV, and both feeders share below-grade manholes. The WWTF began to experience failures with the cable elbows in the manholes and accessing the confined space was … Read More

Duranes Pump Station Electrical Improvements

Duranes Pump Station Electrical Improvements ClientCity of Albuquerque Completion2017 SizeTwo 500HP Motors Cost$1,421,086 Originally constructed in 1962, the Duranes Storm Pump Station collects runoff from approximately 300 acres with inlet flows up to 117,000 gpm. The existing 2300V electrical equipment began to experience failures. The untypical voltage presented issues for replacement components. Additionally, the exposed resister bank presented safety concerns … Read More

Buckman Water Treatment Plant

Buckman Water Treatment Plant ClientSanta Fe Completion2009 Size800HP Booster Pump/ 3,200A Switchboard Cost$3 M Molzen Corbin provided complete electrical design for new Booster Stations # 4A and #5A at the new Buckman Water Treatment Plant. The booster stations are housed in a single structure and consist of a combined 800HP of booster pumps powered by a 3,200A switchboard and feed … Read More