Double Eagle II Midfield Development, Phases I & II

Double Eagle II Midfield Development, Phases I & II ClientDouble Eagle II, City of Albuquerque Completion2006 Size50 Acres Cost$3,244,744 Continued growth at DE II Airport created a demand for additional aircraft storage. This project included utility, landside, and airside extension and access improvements for approximately 50 acres of additional lease area adjacent to the existing hangar and fixed base operator … Read More

Lea County Regional Airport New Terminal Apron

Lea County Regional Airport New Terminal Apron ClientLea County Regional Airport (Hobbs) Completion2020 SizeN/A Cost$1,215,500 Due to two successfully completed projects at the Lea County Regional Airport in 2020 (the extension of the runway safety area [RSA] for Runway 3-21 and a terminal expansion), Molzen Corbin led the design of a new concrete terminal apron outside of the terminals. The … Read More

Lea County Regional Airport Runway 12-30 Reconstruction Project

Lea County Regional Airport Runway 12-30 Reconstruction Project ClientLea County Regional Airport (Hobbs) Completion2017 Size6,002 × 150 Feet Cost$5,618,767 What started as a rather minor reconstruction of approximately one third of Runway 12-30 at the Lea County Regional Airport in Hobbs, turned into reconstruction of the entire runway. Molzen Corbin completed the project in time for the 2016 grant year and … Read More

Santa Fe Municipal Airport Terminal Renovation

Santa Fe Municipal Airport Terminal Renovation ClientSanta Fe Municipal Airport Completion2006 (2019 In Design) Size9,700 square-foot airport terminal building Cost$658,000 ADA compliance safety issues and post-9/11 security requirements were instrumental in triggering the renovation of the Santa Fe Municipal Airport Terminal. The overriding project challenge was integrating modern technology into the unique architectural design context of the original building. Molzen … Read More

Lea County Regional Airport Aircraft Rescue and Firefighting Building

Lea County Regional Airport Aircraft Rescue and Firefighting Building ClientLea County Regional Airport (Hobbs) Completion2017 Size8,000 Square Feet Cost$2,059,803 This new facility replaced an existing airport-only facility housed in a make-shift garage. It now serves both the Airport and the County at large. It is approximately 8,000 square-feet with a watch tower. The facility includes 2 double length apparatus bays … Read More

Santa Fe Municipal Airport Aircraft Rescue and Firefighting Building

Santa Fe Municipal Airport Aircraft Rescue and Firefighting Building ClientSanta Fe Municipal Airport Completion2010 Size9,000 Square Feet Cost$2,285,888 Molzen Corbin authored specifications for the purchase of a new Index B Aircraft Rescue and Firefighting Vehicle for SFMA, which was instrumental in helping the Airport to obtain a Part 139 Class I operating certificate. Having procured a new ARFF vehicle, the … Read More

Moriarty Crosswind Runway 18-36

Moriarty Crosswind Runway 18-36 ClientMoriarty Completion2012 Size6,200 x 75 Feet Cost$2,048,100 Molzen Corbin planned, designed and performed construction administration services for the construction of the new crosswind runway at Moriarty Municipal Airport. The project actually was conceived in 1998 in the Airport Action Plan. Molzen Corbin assisted in coordinating the environmental assessment mitigation, the land acquisition and all of the … Read More

Santa Fe Municipal Airport Taxiway F Extension

Santa Fe Municipal Airport Taxiway F Extension ClientSanta Fe Municipal Airport Completion2015 SizeN/A Cost$1,309,868 Taxiway F was extended from Runway 15-33 to the Runway 10 approach. This was a follow-up project to a previous relocation of Taxiway F from the apron to the midfield intersection. Master planning at the time indicated a new, safer Taxiway F route to improve safety … Read More

Lea County Regional Airport Runway Safety Area Expansion

Lea County Regional Airport Runway Safety Area Expansion ClientLea County Regional Airport (Hobbs) Completion2020 Size620-foot Drainage Culvert Cost$1,405,000 The runway safety area (RSA) for Runway 3-21 needed to be expanded to 1,000 feet to meet the Federal Aviation Administration requirement allowing for larger aircraft. This presented a unique challenge as a drainage channel sat just inside the required RSA. To … Read More

Spaceport Water & Sewer Systems

Spaceport Water & Sewer Systems ClientSpaceport Completion2011 Size4 Wells 1.3-Gallon Water Tank 63,000 LF Water Supply Line 14,950 LF Water Transmission Line 17,300 LF Wastewater Collection Line 20,000-Gallon Effluent Tank Cost$9,700,000 The location of Spaceport America in a region with limited water resources made it necessary to use and re-use available water as efficiently as possible.  Water: Developing a sustainable … Read More