I-25/Williamsburg Interchange ClientNMDOT Completion2025 Cost$40.9 million The I-25/Williamsburg Interchange Improvements project saw to the replacement of the existing deficient, flood-prone trumpet-style interchange with a modern, resilient diamond interchange that enhances safety, drainage performance, and community identity for the Village of Williamsburg and southern New Mexico travelers. As prime consultant, Molzen Corbin led planning, drainage analysis, and roadway and bridge design, … Read More
National Championship Air Races Infrastructure Program
National Championship Air Races Infrastructure Program ClientRoswell International Air Center Completion2025 Cost$15 million The Roswell International Air Center National Championship Air Races Infrastructure Program was a highly collaborative effort among the City of Roswell, Chavez County, the State of New Mexico, the Reno Air Racing Association and Molzen Corbin to plan, design, construct, and activate a complex event site in … Read More
NMSU Football Operations Center
NMSU Football Operations Center ClientNMSU Completion2025 Size18,000 square foot Cost$13.97 Million The New Mexico State University Football Operations Center is an 18,000-square-foot, high-performance addition to the Aggie Memorial Stadium complex that integrates athletics, academics, and sustainability within a constrained infill site. Designed with a split-level configuration to provide both field and concourse access, the facility required innovative structural solutions, including … Read More
Santa Fe Airport Terminal Expansion
Santa Fe Airport Terminal Expansion ClientSanta Fe Municipal Airport Completion2024 Size24,502 Square Feet Cost$23.1 Million The Santa Fe Regional Airport Terminal Building, a vital gateway to northern New Mexico for a wide range of travelers, had become too small to handle rising passenger volumes, leading to overcrowding, long TSA lines, and diminished travel experiences. To address these issues, the City … Read More
Anthony Wastewater Treatment Plant Expansion
Anthony Wastewater Treatment Plant Expansion ClientAWSD Completion2024 Size1.3 MGD Cost$27.1 Million The Anthony Water and Sanitation District (AWSD) Wastewater Treatment Facility underwent a major upgrade, replacing a failing plant with a modern, efficient system after years of Clean Water Act violations. Designed by Molzen Corbin, the new parallel treatment facility—featuring a 1.3 MGD capacity—allows seamless flow transfers and rehabilitation of … Read More
US 285 Corridor Improvements
US 285 Corridor Improvements ClientNMDOT Completion2024 Size22 Miles Cost$142.1 million The US 285 Corridor Improvements project involved the comprehensive study, design, and construction of a 22-mile stretch from the New Mexico-Texas state line through Loving, New Mexico, aiming to enhance safety and traffic flow in a high-volume oil-producing region. Faced with deteriorating infrastructure and increasing truck traffic, Molzen Corbin expanded … Read More
Bosque Farms Wastewater Collection System
Bosque Farms Wastewater Collection System ClientBosque Farms Completion1999 (Phase I) 2002 (Phase II) Size47,400 LF Sewer Line 500,000 GPD Cost$4,083,460 The Village of Bosque Farms is a rural community located approximately 15 miles south of Albuquerque, New Mexico. Wastewater in the community had historically been treated using on-site systems. To address concerns about ground water contamination from these on-site systems, … Read More
Los Alamos Wastewater Treatment Plant
Los Alamos Wastewater Treatment Plant ClientLos Alamos Completion2007 Size1.4 MGD Cost$12,254,643 Molzen Corbin has remained at the forefront of wastewater engineering, making state-of-the-art systems accessible and affordable to communities across the State. For Los Alamos County, Molzen Corbin designed an award-winning facility that balances process, hydraulics, civil, architectural, and electrical components with protecting and preserving the environmentally-sensitive site location in … Read More
Los Lunas Wastewater Treatment Plant
Los Lunas Wastewater Treatment Plant ClientLos Lunas Completion2011 Size1.8 MGD Cost$14,957,565 The Village of Los Lunas Wastewater Treatment Facility, designed by Molzen Corbin, was awarded the 2011 Engineering Excellence Awards by both the New Mexico Chapter and National Organization of the American Council of Engineering Companies (ACEC). The facility was one of the first membrane bioreactor (MBR) treatment plants in … Read More
Ruidoso Wastewater Treatment Plant
Ruidoso Wastewater Treatment Plant ClientRuidoso Completion2012 Size2.7 MGD Cost$6,833,268 A state-of-the-art design was accomplished by the Molzen Corbin team, by carefully placing divider walls to achieve maximum reactor process efficiencies, varying recycle points and quantities using computer modeling, and strategically placing chemical inputs to minimize chemical costs based on reaction kinetics. The challenges faced during the two-year construction period were … Read More