I-25/Williamsburg Interchange

I-25/Williamsburg Interchange ClientNMDOT Completion2025 Cost$40.9 million The I-25/Williamsburg Interchange Improvements project saw to the replacement of the existing deficient, flood-prone trumpet-style interchange with a modern, resilient diamond interchange that enhances safety, drainage performance, and community identity for the Village of Williamsburg and southern New Mexico travelers. As prime consultant, Molzen Corbin led planning, drainage analysis, and roadway and bridge design, … Read More

National Championship Air Races Infrastructure Program

National Championship Air Races Infrastructure Program ClientRoswell International Air Center Completion2025 Cost$15 million The Roswell International Air Center National Championship Air Races Infrastructure Program was a highly collaborative effort among the City of Roswell, Chavez County, the State of New Mexico, the Reno Air Racing Association and Molzen Corbin to plan, design, construct, and activate a complex event site in … Read More

NMSU Football Operations Center

NMSU Football Operations Center ClientNMSU Completion2025 Size18,000 square foot Cost$13.97 Million The New Mexico State University Football Operations Center is an 18,000-square-foot, high-performance addition to the Aggie Memorial Stadium complex that integrates athletics, academics, and sustainability within a constrained infill site. Designed with a split-level configuration to provide both field and concourse access, the facility required innovative structural solutions, including … Read More

US 285 Corridor Improvements

US 285 Corridor Improvements ClientNMDOT Completion2024 Size22 Miles Cost$142.1 million The US 285 Corridor Improvements project involved the comprehensive study, design, and construction of a 22-mile stretch from the New Mexico-Texas state line through Loving, New Mexico, aiming to enhance safety and traffic flow in a high-volume oil-producing region. Faced with deteriorating infrastructure and increasing truck traffic, Molzen Corbin expanded … Read More

I-25/University Interchange

I-25/University Interchange ClientNMDOT Completion2021 Cost$38,000,000 (Est.) Molzen Corbin completed the design of the I-25/ University Interchange Project in 2020. This NMDOT-led project was a collaborative effort between the NMDOT, City of Las Cruces, and NMSU to ease traffic congestion along I-25 and University Avenue and to improve multimodal access and safety through and around this high-volume intersection. This project included … Read More

Albuquerque International Sunport Airfield Center of Excellence (ACE) Infrastructure Development

Albuquerque International Sunport Airfield Center of Excellence (ACE) Infrastructure Development ClientAlbuquerque International Sunport, City of Albuquerque Completion2018 Size80 Acres Cost$6,373,466 The Molzen Corbin Team designed and oversaw construction of the Aviation Center of Excellence (ACE) project located within the Albuquerque Sunport property. The ACE project is envisioned as an emerging business hub, promoting economic growth and collaboration between Albuquerque’s R&D … Read More

Double Eagle II Access Road Realignment

Double Eagle II Access Road Realignment ClientDouble Eagle II, City of Albuquerque Completion2009 SizeN/A Cost$962,627.56 The north and south access road (Paseo del Volcan) interchange leading into the Double Eagle II Airport had a compound curve that was a safety issue and was partial cause of several serious traffic accidents since the alignment was constructed in 1995. Molzen Corbin redesigned … Read More

Diverging Diamond Interchange

I-25/NM 14 (Cerrillos Road) Diverging Diamond Interchange ClientNMDOT Completion2016 SizeInterchange Cost$21 million The redesign of the I-25/NM 14 (Cerrillos Road) Diverging Diamond Interchange (DDI) was an exercise in creativity, and an opportunity for the engineering team to think outside the box of typical roadway design. The first of its kind in New Mexico – DDI will make traveling safer and … Read More