Tijeras Village Hall ClientTijeras Completion2007 Size6,000 Square Feet Cost$786,600 Molzen Corbin designed the Village’s original municipal building in 1984. This facility included a small Village Hall, an area for the Motor Vehicle Department and the Village’s only Fire Station. In 2007, Molzen Corbin designed renovations providing much-needed work space for Village staff, as well as expanded MVD facilities for the … Read More
Belen Fire Station
Belen Fire Station ClientBelen Completion2018 Size13,000 square-feet Cost$3,190,800 This new facility is approximately 13,000 square-feet and is occupied continuously 24 hours per day, seven days per week. The facility, which held its ribbon cutting ceremony in January of 2019, includes apparatus bays for firefighting and emergency-response vehicles, apparatus bay support areas where the vehicles and firefighting equipment will be cleaned … Read More
Moriarty SCADA System
Moriarty SCADA System ClientMoriarity Completion2017 SizeN/A Cost$288,511 The City of Moriarty’s Supervisory Control and Data Acquisition (SCADA) system has brought a significant change to the way the City’s water distribution system is controlled and monitored. For 10 years the water system required significant operator involvement. Driving from site-to-site to start and stop pumps, record data and then take the data … Read More
Anthony Reverse Osmosis Water Treatment Plant
Anthony Reverse Osmosis Water Treatment Plant ClientAWSD Completion2013 Size 600 GPM Cost$5,905,670 The Molzen Corbin team wanted to go beyond just making the tap water meet regulatory standards for the residents of Anthony by providing water that was not only safe but also tasted great. The team evaluated the legalities, water rights issues, and groundwater situation. We then developed a … Read More
UNM Indoor Practice Facility
UNM Football Indoor Practice Facility ClientUniversity of New Mexico Size89,856-square-foot Cost$5.3 Million University of New Mexico’s (UNM) Indoor Football Practice Facility, an 89,856-square-foot facility, is the first of its kind in New Mexico and one of only a handful nationwide, providing both the Lobos and the University with a new competitive edge. The professional-caliber facility is similar to those used … Read More
Mesilla Plaza Kiosko
Mesilla Plaza Kiosko ClientMesilla Completion2014 SizeN/A Cost$155,982 The historic Plaza in Mesilla is the focal point of the downtown area and a celebration space for the entire community. Over many years, the kiosko at the center of the Plaza had deteriorated almost to the point of collapse. The Molzen Corbin team designed improvements that re-used as much of the original … Read More
Los Lunas Fire Station
Los Lunas Fire Station #2 ClientLos Lunas Completion2018 Size16,000 Square Feet Cost$4,022,860 The talents of the Molzen Corbin design team integrated the needs of the community on a site owned by the Village and provided ample space for the building, as well as space for maneuverability of large vehicles and a training yard with a training tower. This facility is … Read More
Las Cruces Cogeneration System
Las Cruces Cogeneration System ClientLas Cruces Completion2018 SizeTwo 300-kW Generators Cost$4,485,268 The City of Las Cruces hired Molzen Corbin to design a cogeneration facility at the Jacob A. Hands Wastewater Treatment Plant. The new facility would take methane, which is a byproduct of the digestion process, and use it to create electrical power and usable heat. This facility includes gas … Read More
Diverging Diamond Interchange
I-25/NM 14 (Cerrillos Road) Diverging Diamond Interchange ClientNMDOT Completion2016 SizeInterchange Cost$21 million The redesign of the I-25/NM 14 (Cerrillos Road) Diverging Diamond Interchange (DDI) was an exercise in creativity, and an opportunity for the engineering team to think outside the box of typical roadway design. The first of its kind in New Mexico – DDI will make traveling safer and … Read More
Spaceport America Runway 16-34
Spaceport America Runway 16-34 ClientSpaceport America Completion2010 Size10,000 x 200 Feet Cost$27,000,000 This project consisted of a new concrete paved runway, 10,000 feet long and 200 feet wide, with 14-inch-thick concrete pavement. Molzen Corbin was involved in this project from the very first planning stages, including wind analysis to set the proper runway alignment, and continued through the project design … Read More











