Bosque Farms Wastewater Collection System

Bosque Farms Wastewater Collection System ClientBosque Farms Completion1999 (Phase I) 2002 (Phase II) Size47,400 LF Sewer Line 500,000 GPD Cost$4,083,460 The Village of Bosque Farms is a rural community located approximately 15 miles south of Albuquerque, New Mexico. Wastewater in the community had historically been treated using on-site systems. To address concerns about ground water contamination from these on-site systems, … Read More

Los Alamos Wastewater Treatment Plant

Los Alamos Wastewater Treatment Plant ClientLos Alamos Completion2007 Size1.4 MGD Cost$12,254,643 Molzen Corbin has remained at the forefront of wastewater engineering, making state-of-the-art systems accessible and affordable to communities across the State. For Los Alamos County, Molzen Corbin designed an award-winning facility that balances process, hydraulics, civil, architectural, and electrical components with protecting and preserving the environmentally-sensitive site location in … Read More

Los Lunas Wastewater Treatment Plant

Los Lunas Wastewater Treatment Plant ClientLos Lunas Completion2011 Size1.8 MGD Cost$14,957,565 The Village of Los Lunas Wastewater Treatment Facility, designed by Molzen Corbin, was awarded the 2011 Engineering Excellence Awards by both the New Mexico Chapter and National Organization of the American Council of Engineering Companies (ACEC). The facility was one of the first membrane bioreactor (MBR) treatment plants in … Read More

Chama Oxidating Ditch Wastewater Treatment Plant

Chama Oxidating Ditch Wastewater Treatment Plant ClientChama Completion2018 Size100,000 GPD Cost$7,779,842 The Village of Chama’s new WWTP features an innovative spin on a robust and reliable technology to accomplish biological nutrient removal (BNR). Biological modeling was performed to ensure that treatment basins and other design components adequately considered Chama’s challenging environmental conditions. The new WWTP is a colossal achievement – … Read More

Anthony Wastewater Treatment Plant

Anthony Wastewater Treatment Plant ClientAWSD Completion1995 Size0.98 MGD Cost$2,049,000 Molzen Corbin has worked with AWSD since 1982, and we designed a new 0.98 mgd facility on the same site as the existing plant while accommodating a tight timeframe and keeping the existing plant operational during construction. The new treatment facility was designed as an activated sludge system containing all process … Read More

AWSD Waterline and Rio Grande Directional Drill Crossing

AWSD Waterline and Rio Grande Directional Drill Crossing ClientAWSD Completion2019 Size2.5 Miles of Water Lines 895 LF Horizontal Directional Drill” Cost$892,689 AWSD sought Molzen Corbin’s assistance with providing potable water for an area of Dona Ana County that was being served by both an aging, inadequate water system and wells that had gone dry. Many residents had resorted to hauling … Read More

Las Cruces West Mesa Water System Improvements

Las Cruces West Mesa Water System Improvements ClientCity of Las Cruces Completion2010 (Phase IV-B) Size2 Wells (3,500 GPM each) 46,500 LF water and transmission line 4.5-Million Gallon Reservoir Cost$931,021 (Phase IV-B) This was a four-phase project that included various water supply, transmission, and storage improvements. Highlights included a high-capacity booster station consisting of three 1,000 GPM booster pumps, as well … Read More

Zuni Pueblo Water Improvements Project

Zuni Pueblo Water Improvements Project ClientZuni Pueblo Completion2002 Size2 Wells (1,430 GPM Each) Two 1-million Gallon Tanks 14 miles of Transmission Line 8 miles of Distribution Lines Cost$14,000,000 For more than 20 years, the Pueblo of Zuni depended on bottled water for all of their drinking water needs. The Pueblo hired Molzen Corbin to help the Pueblo solve their water … Read More

Albuquerque International Sunport Long-Term Parking Photovoltaic Improvements

Albuquerque International Sunport Long-Term Parking Photovoltaic Improvements ClientAlbuquerque International Sunport, City of Albuquerque Completion2013 Size4,000 PV Panels/Two 500kW Inverters Cost$3,306,999 Molzen Corbin designed and provided construction phase services for a 1 Megawatt solar photovoltaic system in the long-term parking lot at the Albuquerque International Sunport. We leveraged federal funding to develop the system installed on top of carports mounted on … Read More