Raton Aquatic Health & Fitness Center ClientRaton Completion2009 Size42,000 Square Feet (Building) 5,000 Square Feet (Pool) Cost$7,609,800 Molzen Corbin designed the facility as a multi-phased project, with the first phase including the 5,000-square-foot indoor swimming pool which was the first year-round pool to be operated in Northeast New Mexico and Southeast Colorado. The three-phase, 42,000-square-foot building was designed to serve … Read More
Alameda Reuse Diversion Facility
Alameda Reuse Diversion Facility ClientAlbuquerque Completion2004 Size2,400 Square Feet Cost$570,000 The award-winning North I-25 Reclamation/Reuse System Nonpotable Surface Water Reclamation Project was designed by Molzen Corbin to architecturally blend into the natural environment. The result is a structure that incorporates curves and textures that blend into the native environment and express the concept of water. The colors and materials were … Read More
Girard Boulevard Streetscape
Girard Boulevard Streetscape ClientAlbuquerque Completion2020 Size8 Total Acres Cost$2,245,116 The award-winning Girard Boulevard Streetscape Improvements Project for the City of Albuquerque Aviation Department project serves a heavily traveled corridor that is a gateway to the Albuquerque International Sunport, welcoming visitors to Albuquerque and the Land of Enchantment. The corridor also provides access to well-established office buildings on the west side … Read More
Santa Fe Municipal Airport Terminal Renovation
Santa Fe Municipal Airport Terminal Renovation ClientSanta Fe Municipal Airport Completion2006 (2019 In Design) Size9,700 square-foot airport terminal building Cost$658,000 ADA compliance safety issues and post-9/11 security requirements were instrumental in triggering the renovation of the Santa Fe Municipal Airport Terminal. The overriding project challenge was integrating modern technology into the unique architectural design context of the original building. Molzen … Read More
Lea County Regional Airport Aircraft Rescue and Firefighting Building
Lea County Regional Airport Aircraft Rescue and Firefighting Building ClientLea County Regional Airport (Hobbs) Completion2017 Size8,000 Square Feet Cost$2,059,803 This new facility replaced an existing airport-only facility housed in a make-shift garage. It now serves both the Airport and the County at large. It is approximately 8,000 square-feet with a watch tower. The facility includes 2 double length apparatus bays … Read More
Santa Fe Municipal Airport Aircraft Rescue and Firefighting Building
Santa Fe Municipal Airport Aircraft Rescue and Firefighting Building ClientSanta Fe Municipal Airport Completion2010 Size9,000 Square Feet Cost$2,285,888 Molzen Corbin authored specifications for the purchase of a new Index B Aircraft Rescue and Firefighting Vehicle for SFMA, which was instrumental in helping the Airport to obtain a Part 139 Class I operating certificate. Having procured a new ARFF vehicle, the … Read More
Belen Fire Station
Belen Fire Station ClientBelen Completion2018 Size13,000 square-feet Cost$3,190,800 This new facility is approximately 13,000 square-feet and is occupied continuously 24 hours per day, seven days per week. The facility, which held its ribbon cutting ceremony in January of 2019, includes apparatus bays for firefighting and emergency-response vehicles, apparatus bay support areas where the vehicles and firefighting equipment will be cleaned … Read More
UNM Indoor Practice Facility
UNM Football Indoor Practice Facility ClientUniversity of New Mexico Size89,856-square-foot Cost$5.3 Million University of New Mexico’s (UNM) Indoor Football Practice Facility, an 89,856-square-foot facility, is the first of its kind in New Mexico and one of only a handful nationwide, providing both the Lobos and the University with a new competitive edge. The professional-caliber facility is similar to those used … Read More
Mesilla Plaza Kiosko
Mesilla Plaza Kiosko ClientMesilla Completion2014 SizeN/A Cost$155,982 The historic Plaza in Mesilla is the focal point of the downtown area and a celebration space for the entire community. Over many years, the kiosko at the center of the Plaza had deteriorated almost to the point of collapse. The Molzen Corbin team designed improvements that re-used as much of the original … Read More
Los Lunas Fire Station
Los Lunas Fire Station #2 ClientLos Lunas Completion2018 Size16,000 Square Feet Cost$4,022,860 The talents of the Molzen Corbin design team integrated the needs of the community on a site owned by the Village and provided ample space for the building, as well as space for maneuverability of large vehicles and a training yard with a training tower. This facility is … Read More