Ruidoso Wastewater Treatment Plant

Ruidoso Wastewater Treatment Plant ClientRuidoso Completion2012 Size2.7 MGD Cost$6,833,268 A state-of-the-art design was accomplished by the Molzen Corbin team, by carefully placing divider walls to achieve maximum reactor process efficiencies, varying recycle points and quantities using computer modeling, and strategically placing chemical inputs to minimize chemical costs based on reaction kinetics. The challenges faced during the two-year construction period were … Read More

Mesilla Plaza Kiosko

Mesilla Plaza Kiosko ClientMesilla Completion2014 SizeN/A Cost$155,982 The historic Plaza in Mesilla is the focal point of the downtown area and a celebration space for the entire community. Over many years, the kiosko at the center of the Plaza had deteriorated almost to the point of collapse. The Molzen Corbin team designed improvements that re-used as much of the original … Read More

Los Lunas Fire Station

Los Lunas Fire Station #2 ClientLos Lunas Completion2018 Size16,000 Square Feet Cost$4,022,860 The talents of the Molzen Corbin design team integrated the needs of the community on a site owned by the Village and provided ample space for the building, as well as space for maneuverability of large vehicles and a training yard with a training tower. This facility is … Read More

Las Cruces
 Cogeneration System

Las Cruces Cogeneration System ClientLas Cruces Completion2018 SizeTwo 300-kW Generators Cost$4,485,268 The City of Las Cruces hired Molzen Corbin to design a cogeneration facility at the Jacob A. Hands Wastewater Treatment Plant. The new facility would take methane, which is a byproduct of the digestion process, and use it to create electrical power and usable heat. This facility includes gas … Read More

Diverging Diamond Interchange

I-25/NM 14 (Cerrillos Road) Diverging Diamond Interchange ClientNMDOT Completion2016 SizeInterchange Cost$21 million The redesign of the I-25/NM 14 (Cerrillos Road) Diverging Diamond Interchange (DDI) was an exercise in creativity, and an opportunity for the engineering team to think outside the box of typical roadway design. The first of its kind in New Mexico – DDI will make traveling safer and … Read More

Spaceport America Runway 16-34

Spaceport America Runway 16-34 ClientSpaceport America Completion2010 Size10,000 x 200 Feet Cost$27,000,000 This project consisted of a new concrete paved runway, 10,000 feet long and 200 feet wide, with 14-inch-thick concrete pavement. Molzen Corbin was involved in this project from the very first planning stages, including wind analysis to set the proper runway alignment, and continued through the project design … Read More