Client
Village of Tijeras
Completion
2014 (Phase III-D)
Size
11-Miles of Water/Transmission Lines
Cost
$2,034,969 (Phase III-D)
Molzen Corbin provided complete electrical design for new Booster Stations # 4A and #5A at the new Buckman Water Treatment Plant. The booster stations are housed in a single structure and consist of a combined 800HP of booster pumps powered by a 3,200A switchboard and feed from a redundant set of 2MVA service transformers.
Scope of Work
Water, Grants/Funding, Construction Observation/Administration
Share this Post
![](https://www.molzencorbin.com/wp-content/uploads/2021/03/Tijeras-Water-System-Improvements-1.jpg)
![](https://www.molzencorbin.com/wp-content/uploads/2021/03/Tijeras-Water-System-Improvements-3.jpg)
![](https://www.molzencorbin.com/wp-content/uploads/2021/03/Tijeras-Water-System-Improvements-5.jpg)
![](https://www.molzencorbin.com/wp-content/uploads/2021/03/Tijeras-Water-System-Improvements-4.jpg)