Client
NMDOT
Completion
2016
Size
Interchange
Cost
$14,590,964
The I-25/Missouri Bridge Project consisted of adding a lane to I-25 in both directions from University Avenue (Exit 1) to Lohman Avenue (Exit 3) and improvements to City of Las Cruces streets. This $15.6 million project improved I-25 with three 12-foot driving lanes and 10-foot shoulders in each direction, a new bridge with a 70-year design life, and improved vertical geometry to correct sight distance problems. The City street improvements include additional turning lanes, new signals, ADA-compliant sidewalks, and improved safety through access control. The NMDOT had a very strict funding deadline for improvements to the I-25/Missouri Bridge and placed its confidence in Molzen Corbin to deliver the entire project (from study to design) in less than 13 months.
Scope of Work
Roadway Design
Share this Post